Request a callback
VIEN

OFFICES · HANOI AND NEARBY AREAS

Office construction. Spaces organised for work.

D&C Vietnam provides office construction, refurbishment and finishing services in Hanoi and nearby areas. The starting point is a workplace suited to how your business operates, with the construction scope defined for the individual project.

Open-plan office with glass partitions and shared working areas

A place to welcome visitors. A place to work.

A separate office building and an administration block within a factory both need to connect people, everyday tasks and the conditions of the building they occupy.

01 / LAYOUT

Reflect how your team works

Workstations, meeting rooms, visitor areas and support spaces need to be considered alongside circulation, focused work and opportunities for discussion between colleagues.

02 / EXISTING CONDITIONS

Work with the premises

Existing structural conditions, floor levels, access routes and building rules form the basis for assessing an office construction or refurbishment proposal.

03 / FINISHING

Quality in appearance and use

Materials, colours, junction details and ease of cleaning should be considered together with intended use. A perspective image alone does not define a finish.

New premises, refurbishment and finishing.

01 / CONSTRUCTION

New office buildings

Discuss the intended use of a standalone office or a factory administration block, then define the building works to be included in the project documents.

02 / REFURBISHMENT

Existing workplaces

Reorganise a layout, upgrade the space and consider finishing work against existing conditions. The areas available for construction need to be identified before work begins.

03 / INTERIORS

Business environments

D&C Infinity focuses on office design, interior construction and refurbishment, relating the organisation of the workplace to the business using it.

A defined scope. A basis for inspection.

A project-specific proposal should identify the work items, materials, site conditions and deliverables. Specialist technical requirements and interfaces need to be established with the responsible parties and professionals whose roles are agreed for that project.

01 / AGREEMENT

Documents and technical interfaces

Identify the applicable drawings, connection points and the parties who confirm them before proceeding. Record decisions that change materials, quantities or the scope of the work.

02 / COORDINATION

Work within actual site conditions

Discuss access times, deliveries, protection of shared areas and potential effects on office activities. Refurbishment sequencing needs to reflect the areas that can be handed over for work.

03 / ACCEPTANCE

Inspection and handover

Agree the criteria for checking finishes, the handover documents, outstanding items and the responsibilities that continue after construction under the contract.

Planning a new working environment?

Share the location, intended use, available layout and target milestones to begin an initial discussion with D&C Vietnam about the proposed office works.

LET’S DISCUSS YOUR PROJECT

Leave your number.
Start the conversation.

Planning an industrial building, factory refurbishment or office in Hanoi and nearby areas? Leave your number so D&C can contact you about your requirements.

Include your country code if you are outside Vietnam, e.g. +81 or +82.

Add optional project details

After successful submission, your request is saved for the D&C team. No document upload is needed.

Request a callback